How ABM reduced costs and time by automating parking stall layout

By partnering with Dusty Robotics to automate printing of parking stalls the LAX Central Terminal Area (CTA), ABM compressed timelines to complete the job ahead of schedule and reopen garages on time minimizing impact on travelers.
Header image
8
Garages
33
Floors
3.3 Million
Square Feet
7,000
Parking Spaces

"Having Dusty in our toolkit completely overhauled how we were able to execute our installations. Dynamic environments require agility and flexibility and utilizing Dusty allowed us to meet those demands and get out faster every time."

Ryan Hooker
Project Manager, ABM

Challenges

Shutting down parking structures at the 5th busiest airport in the world creates headaches for travelers and contractors alike. So, when updating the Central Terminal at LAX, ABM needed a faster, more accurate alternative to the manual, string and chalk method of line striping.

Solution

Using Dusty to lay out parking stalls at Los Angeles International Airport, ABM Industries reduced layout time by over 90%, allowing the garages to open back up faster than planned. Dusty was able to print parking stalls, directional arrows for entrances and exits, traffic flow indicators, and handicap line-markings. Results exceeded expectations:
450,000
Linear Feet Printed
100%
Accuracy
939
Linear Feet Printed/Hour
6,864
Man-Hours Saved