RG Construction

Headquartered in Chicago, IL
RG Construction is one of the largest wall and ceiling contractors in Chicagoland, delivering Dusty-powered automated layout alongside prefabrication and VDC services.

Founded in 1977, RG Construction Services has grown into one of the largest wall and ceiling contractors in Chicagoland and throughout the Midwest. The company integrates LEAN delivery, VDC/BIM services, and prefabrication into its operations — and now offers Dusty-powered automated layout as a service to all trades on its projects.

On a $420 million Cleveland Clinic expansion with Gilbane Construction, RG used the FieldPrinter to lay out 296,000 square feet of multi-trade information, finishing layout four weeks ahead of schedule. RG now specifies Dusty Robotics directly in project requirements with its general contractor partners.

What You Get with RG Construction:

  • Multi-Trade Layout — all trades printed on the slab from a single coordinated model, eliminating the need to chase drawings
  • Prefab-Integrated Workflow — layout aligned to prefabricated pod and panel assemblies for seamless field installation
  • LEAN Delivery — layout embedded in a LEAN construction process focused on reducing waste, rework, and schedule risk
  • Proven at Scale — 296,000 SF healthcare project completed four weeks ahead of framing schedule with 50% reduction in on-site labor

Learn more at rgconstruction.com.

Areas of Expertise

Automated layout as a service for commercial wall, ceiling, mission critical and healthcare construction

Additional Services

Virtual Design Construction / BIM services

Prefabrication and prefabricated pod assemblies

Cold-formed load bearing metal framed structures

Prefabricated exterior wall assemblies (StoPanel)

LEAN delivery systems and Target Value Design

Geographic Focus

U.S. Midwest (Illinois, Iowa, Wisconsin, Indiana, Ohio)

RG Construction worked on a $420 million 2-building expansion for Cleveland Clinic’s Global Center for Pathogen and Human Health Research with Gilbane Construction. Their Dusty-powered multi-trade layout workflow unlocked an aggressive prefabrication strategy that took 4 weeks off the overall framing schedule, reduced rework, and created cascading efficiencies for all the trades that followed.

Read the full story.

Find out how to get Dusty on your next project

Integration iconIntegration iconIntegration iconIntegration iconIntegration iconIntegration icon